Action
Notice of Intent to Prepare an Environmental Impact Statement.
Summary
The Federal Transit Administration (FTA), as the federal lead agency, and the Metro Gold Line Foothill Extension Construction Authority (Construction Authority) intend to prepare an Environmental Impact Statement (EIS) for proposed transit improvements in the Foothill Extension Transit Corridor. FTA is the lead Federal agency with the Construction Authority as a co-lead agency for the National Environmental Policy Act (NEPA) process because the Construction Authority is seeking Federal funding for the proposed project. The proposed project is an extension of the existing Metro Gold Line light rail transit line, from Azusa to Montclair, with proposed stations in Glendora, San Dimas, La Verne, Pomona, Claremont and Montclair. The proposed project will improve mobility in eastern Los Angeles County and western San Bernardino County by introducing high-frequency transit service options; enhance the regional transit network by interconnecting existing and planned rail and bus transit lines; provide an alternative mode of transportation for commuters who currently use the congested I-210 corridor; improve transit accessibility for residents and employees who live and/or work along the corridor; and encourage a mode shift to transit, reducing air pollution and greenhouse gas emissions. The EIS will be prepared in accordance with the requirements of NEPA and its implementing regulations. Prior to commencement of a Final EIS, a locally preferred alternative (LPA) will be identified and adopted by the Construction Authority Board and included in the Los Angeles County Metropolitan Transportation Authority (LACMTA) Constrained Long Range Transportation Plan (LRTP). LACMTA and the Construction Authority do not currently anticipate applying for 43 U.S.C. 5309 New Starts funding. The Construction Authority will be preparing a joint EIS/EIR document to comply with NEPA and the California Environmental Quality Act (CEQA). The purpose of this notice is to alert interested parties regarding the intent to prepare the EIS, to provide information on the nature of the proposed project and possible alternatives, to invite public participation in the EIS process (including providing comments on the scope of the Draft EIS), to announce that public scoping meetings will be conducted, and to invite participating and cooperating agencies.