Regional Connector Transit Corridor Capital Investment Program Project Profiles: FY 2017
The Los Angeles County Metropolitan Transportation Authority (LACMTA) is constructing a 1.9 mile double track light rail transit line in downtown Los Angeles, with 3 new underground stations and the procurement of 4 light rail vehicles. The project will begin at the existing 7th Street/Metro Center Station and will provide connections via a new underground alignment to the existing Metro Blue, Exposition, and Gold Lines. The alignment will extend north underground from the 7th Street/Metro Center Station following Flower Street, curving east under the 2nd Street roadway tunnel and 2nd Street, and continuing east under the intersection of 1st and Alameda Streets, surfacing to connect to the Metro Gold Line tracks within 1st Street at grade to the east and north of Temple Street toward Union Station