Central Corridor Light Rail Transit Project; Minneapolis-St. Paul, MN
This Before-and-After study summarizes the predicted versus actual physical scope, capital cost, transit service levels, operating and maintenance costs, and ridership for the Central Corridor Light Rail Transit Project that opened in 2014.