East San Fernando Valley (ESFV) Transit Corridor Phase 1 Project Profile
The Los Angeles County Metropolitan Transportation Authority (LACMTA) proposes to construct the East San Fernando Valley Transit Corridor Phase 1 Project (the Project), a 6.7-mile at-grade light rail transit (LRT) system with 11 stations, ten traction power substations, overhead contact system, 34 vehicles, and a maintenance and storage facility. The LRT travels in a semi-exclusive right of way in the median of Van Nuys Boulevard, separated by a barrier except at signalized intersections.