Dulles Corridor Metrorail Project Phase 2 Wiehle Avenue Station to Ashburn Station October 2016
The monthly report of FTA’s Project Management Oversight Contractor for the Dulles Corridor Metrorail Project.
The monthly report of FTA’s Project Management Oversight Contractor for the Dulles Corridor Metrorail Project.
The Los Angeles County Metropolitan Transportation Authority (LACMTA) is planning to extend the existing heavy rail system 2.6 miles from the future Century City Constellation Station that is part of the Westside Purple Line Extension Section 2 project to be under construction in 2018. Section 3...
The San Diego Association of Governments (SANDAG) is constructing the Mid-Coast Corridor Transit Project (the Project) which would extend the San Diego Trolley Blue Line from Santa Fe Depot in downtown San Diego to the University Towne Center (UTC) Transit Center in University City. The Project...
The Los Angeles County Metropolitan Transportation Authority (LACMTA) is constructing a 2.59-mile, double track heavy rail transit line below Wilshire Boulevard in the cities of Los Angeles and Beverly Hills with two new underground stations, as well as the purchase of 20 heavy rail vehicles....
The Fort Worth Transportation Authority (FWTA) is building the TEX Rail project, a 26.8 mile commuter rail line that will operate between downtown Fort Worth and northeast Tarrant County (the county where Fort Worth is located) to the Dallas-Fort Worth International Airport (DFW Airport).
The Denver Regional Transportation District (RTD) is constructing a 13-station, 30.2-mile, Commuter Rail project that consists of two lines: the East Corridor from Denver International Airport (DIA) to Downtown Denver at Denver Union Station (DUS) and the Gold Line from DUS westward to Ward Road...
The Chicago Transit Authority (CTA) is expanding capacity along the Red and Purple heavy rail lines in the 5.6-mile segment of the corridor between the Belmont and Howard stations on the north side of Chicago. The project includes reconstruction of four stations and 1.3 route miles of guideway,...
Transcript of presentation given by Center for Transportation and the Environment at a February 1, 2017 webinar on deploying low- or no-emission buses.
This presentation was given by Center for Transportation and the Environment at a February 1, 2017 webinar on deploying low- or no-emission buses.
FTA-sponsored training delivered by the Transportation Safety Institute (TSI) and the National Transit Institute (NTI)