Peninsula Corridor Electrification Project Profile: FY 2022 Annual Report
The Joint Powers Board (JPB or Caltrain) is upgrading and electrifying Caltrain's 51-mile double track commuter rail from the 4th and King Caltrain Station in San Francisco to the Tamien Station in San Jose. The project is being constructed primarily in the existing Caltrain corridor on right-of-way (ROW) controlled by JPB/Caltrain.