Division Street Bus Rapid Transit Project Profile: FY 2025 Annual Report

The Spokane Transit Authority (STA) proposes to implement a bus rapid transit (BRT) service on the Division Street Corridor, in Spokane, Washington. The corridor runs approximately 10 miles from Downtown Spokane in the south to suburban Mead in the north, primarily along Division Street, the...

West Seattle Link Extension Project Profile: FY 2025 Annual Report

(Formerly West Seattle to Ballard Link Extension: West Seattle to SODO)

The Central Puget Sound Regional Transit Authority (Sound Transit) plans to extend the Link light rail system for 4.7 miles from the existing SODO Link station to West Seattle, including three new stations at Delridge,...

Ballard Link Extension Project Profile: FY 2025 Annual Report

(Formerly West Seattle to Ballard Link Extension: SODO to Ballard)

The Central Puget Sound Regional Transit Authority (Sound Transit) plans to extend the Link light rail system for 7.1 miles from the Existing SODO Link Station to Ballard, including nine new or expanded stations at...

RapidRide I Line Project Profile: FY 2025 Annual Report

King County Metro (Metro), proposes to implement bus rapid transit (BRT) between the cities of Renton, Kent, and Auburn. The project includes 23 diesel electric hybrid buses, 1.95 miles of exclusive bus lanes, level boarding stations, off-board fare payment, transit signal priority and queue...

Lynnwood Link Extension Project Profile: FY 2025 Annual Report

The Central Puget Sound Regional Transit Authority (Sound Transit) is building an 8.5-mile extension to the light rail system from the Northgate station in King County to the Lynnwood City Center Station in Snohomish County. The project alignment primarily runs parallel to the existing...

Richmond Highway BRT Project Profile: FY 2025 Annual Report

The Fairfax County Department of Transportation (FCDOT) proposes to implement a new 7.4-mile fixed guideway BRT project on Richmond Highway corridor from the terminus of Washington Metropolitan Area Transit Authority (WMATA) Yellow Line at Huntington Station to Ft. Belvoir, a major US Army...

Midvalley Connector Project Profile: FY 2025 Annual Report

The Utah Transit Authority (UTA) proposes to implement bus rapid transit (BRT) in the corridor connecting the Murray Central Station served by FrontRunner commuter rail and TRAX light-rail to the West Valley Central TRAX light-rail station.